273
Continued.
$ 3,752 76.
In joists ***: iron
190.15
28 50
Do.1 in angle plates, bolts fo.
341 ".15.
88 15.
Do.in tabe
140
.15.
31 00
1-1/4*: x- 1/9*‹ water bar:
149 0.08
11 93
do.
1/8*: pipe including all bends 10.1 3/4
188.
11. 15.
27 90
do.
158
* 1.17
28 86
* 1* dowels: do.'
do.1
# 1 .82
38
5* dowels.)
41
Bol: 10
4 10
1. 3" x 2" x 1/4" crampsto frames Brackets to landing of steps in Tower: fane to detail
78
*.20
15 120
3
* 4.50
13 150
1
"00,00
20:
Allow for:-
Removing cleaning and refitting clock and
new stand for bells
Lightning Conductor:
Electric: LightingTM
To Summary
Glazierz
200.00
200
200
250
4,608 76
do. & do.
Sheet glass and glazing
Plate
Ornamental figured rolled glass
1.30
.10.
25 60
181
.80
54 30
21
# .85
71 35.
87 25
To Summary
Painter.)
Iron.:
Prepare and paint two oils. 1
17/28ga-3,50
$135.
do.1
do.r1/2* pipe
186
b. -.02
do."
3/4*
158
#
.02
3 18
3 18
do.
4'
.08
12
do.
1-1/2*, *
59
.04
2 36
do.1
2"
62
1.041
2 48
do.
4.
84'
.04
3 38
do.3
Vane
1
1,00
do.1
R.] .] Shoes:
4
.05
do. 1
do, 1 Beads
H
do.1
Spiral stains
do.
Brackets
.110. 1.05
.85.
8 75.
2
do.1
1.) (2) Cisterns:
5.
#
.85
1 25.
do.1
„1 Rackstays arret boll's
16
32
do.
Frame and hands to clock
10
05 2,00
11 80-
29 183
30
40
2
Wood, 1
Knot, stop, prime and‹ pafat 3 oils
38.00 94#. 4,00
144
do." do.
cornice
297 Länkt.
.04'
11/88
casement
door: flames, both sides
do.
14: No.-
.50
7:00
32 *
40
12 80:
Newels
11
20
2/20
lantern
1
3
Tarring.
Twice: Oil flaps."
Twice tar: on wood: fe,"
5
80:
150
49.00 Sqa.1.15,
58 35
To Summary
328.98
273
Continued.
$ 3,752 76.
In joists ***: iron
190.15
28 50
Do.1
in angle platas, bolts fo.
341 " .15.
88 15.
Do.in tabe
140
.15.
31 00
1-1/4*: x- 1/9*‹ water bar:
149 0.08
11 93
do.
1/8*: pipe including all bends 10.1 3/4
188.
11. 15.
2790
do.
158
* 1.17
2886
* 1* dowels: do.'
do.1
# 1 .82
38
5* dowels.)
41
Bol: 10
4 10
1. 3" x 2" x 1/4" orampsto frames Brackets to landing of steps in Tower: fane to detail
78
*.20
15120
3
* 4.50
13150
1
"00,00
20:
Allow for:-
Removing cleaning and refiting clock and
new stand for bells
Lightning Conductor:
Blectric: LightingTM
To Summary
Glazierz
200.00
200
200
250
4,608 76
do. & do.
Sheet glass and glæsing
Plate
Ornamental figured rolled glass
1.30
.10.
25 60
181
.80
54 30
21
# .85
7135.
87 25
To Suanary
Painter.)
Iroa.:
Prepare and paint two oils. 1
17/28ga-3,50
$135.
do.1
do.r1/2* pipe
186
b. -.02
do."
3/4*
158
#
.02
3178
3 18
do.
4'
.08
12
do.
1-1/2*, *
59
.04
2136
do.1
2"
62
1.041
2148
do.
4.
84'
.04
3138
do.3
Vane
1
1,00
do.1
R.] .] Shoes:
4
.05
do. 1
do, 1 Beads
H
do.1
Spiral stains
do.
Brackets
.110. 1.05
.85.
8175.
2
do.1
1.) (2) Cisterns:
5.
#
.85
1 25.
do.1
„1 Rackstays arret boll's
16
32
do.
Frame and hands to clock
10
05 2,00
1180-
29 183
30
40
2
Wood, 1
Knot, stop, prime and‹ pafat 3 oils
38.00 94#. 4,00
144
do." do.
cornice
297 Länkt.
.04'
11/88
casement
door: flames, both sides
do.
14: No.-
.50
7:00
32 *
40
12 80:
Newels
11
20
2/20
lantern
1
3
Tarring.
Twice: Oil flaps."
Twice tar: on wood: fe,"
5
80:
150
49.00 Sqa.1.15,
58 35
To Summary
328.98
No comments yet.
Private notes are available after approval.